Public Notices

  • P-2868

    Expiration date: 3/5/2014

    The applicant, Riverview Commerce Park, LLC, requests authorization to create a truck dock with associated access ramps and other infrastructure along the right descending bank of the Mississippi River, at approximate river mile 151.6, in Herculaneum, Jefferson County, Missouri. Written comments must be submitted by replying to this email or by mailing the comments to the address shown in the signature block, below. The Public Notice comment period is open February 12, 2014 and closes on March 5, 2014.

  • P-2863

    Expiration date: 3/6/2014

    The applicant, President Riverboat Casino – Missouri, Inc., proposes to modify their existing permit authorizing the mooring of a gaming vessel. The original permit authorized the placement of fill material into navigable waters in conjunction with the construction of a mooring facility. The permit previously authorized the placement of mooring barges, service and pedestrian ramps, protection cells, and a land based Porte Cochere. The President Riverboat Casino-Missouri, Inc. ceased operation of the President Casino facility motor vessel (M/V) Admiral on June 28, 2010. The applicant removed the Admiral Gaming Vessel, Theater Barge, and spar ramps from the St. Louis Riverfront, as authorized by a General permit in November of 2010. The intent of the current proposal is to leave in place the Porte Cochere and protection cells #1-#3. (Protection cell #4 has been removed by a previously authorized General Permit - Nationwide Permit #22.) The existing Porte Cochere, including canopies, lighting, concrete pedestrian ramps, and guard railings will remain. Once the site is vacated, the permittee will transfer the permit, including all previously authorized conditions, to the City of St. Louis. The project is on the St. Louis waterfront on the right descending bank of the Mississippi River at approximate river mile 180.25, just upstream of the Dr. Martin Luther King Bridge, St. Louis County, Missouri. The Public Notice opens February 10, 2014 and closes March 06, 2014.

  • P-2867

    Expiration date: 3/3/2014

    The applicant, APAC-Brickey's Stone, requests authorization under Section 10 of the Rivers and Harbors Act to create a 25 barge fleet arranged in a 5x5 configuration along the right descending bank of the Mississippi River, at approximate river mile 134.8, in Ste. Genevieve County, Missouri. Written comments must be submitted by replying to this email or by mailing the comments to the address shown in the signature block, below. The Public Notice comment period is open February 10, 2014 and closes on March 3, 2014.

  • P-2862

    Expiration date: 2/27/2014

    Mr. Greg Dolbeare of SIMCO (Sny Island Merchandising Company) proposed to create a grain barge loading facility and grain elevator along the left descending bank of the Mississippi River, at approximate river mile 282.3, near Rockport, Pike County, Illinois. The Public Notice comment period is open February 7, 2014 and closes on February 27, 2014.

  • Public Hearing February

    Expiration date: 3/7/2014

    The U.S. Army Corps of Engineers, St. Louis District (Corps), will hold a Public Hearing for two Draft Environmental Assessments (EAs) for river training structure construction activities (Regulating Works) for the Grand Tower Phase 5 Project and the Dogtooth Bend Phase 5 Project. Where and when: In the Library, at the Shawnee High School (Community Unit School District #84) in Wolf Lake, Illinois, February 19, 2014, at 7:00 p.m. Information on the projects, supporting documents, and maps will also be available for public inspection, February 19, 2014, from 6:00 p.m. to 7:00 p.m. in the library, prior to the public hearing.