Regulatory

Redirecting...

Public Notices

  • P-2929

    Expiration date: 8/10/2015

    The Gavilon Group LLC requests Section 10 Rivers and Harbors Act authorization to construct a barge loading terminal near the left descending bank of the Mississippi River, at approximate river mile 97.3, in Section 33, Township 8 South, Range 5, near Cora, Jackson County, Illinois. The Public Notice comment period opens on July 20, 2015, and closes on August 10, 2015.

  • P-2926

    Expiration date: 7/8/2015

    MoDOT proposes to conduct dredging, open river dredge disposal, construction of a temporary sheet pile bulkhead, mooring of construction related vessels and other associated activities to expand the Poplar Street Bridge at approximate Mississippi River mile 179.2. The Public Notice comment period opens on June 18, 2015, and closes on July 8, 2015.

  • P-2925

    Expiration date: 7/7/2015

    The public notice requests the authorization for commercial development within an emergent wetland, located at 700 Raceway Blvd., in the City of East St. Louis, St. Clair County, Illinois. Gateway Acquisitions, Inc., on behalf of Gateway Motorsports Park, intends to impact 13.39 acres of emergent wetland immediately south of their existing facility to accommodate the construction of a new 1/3-mile paved racetrack and associated parking and infrastructure. Written comments for operations within the St. Louis District must be submitted by replying to this email or by mailing your comments to the address shown in the signature block, below. The Public Notice comment period opens on June 16, 2015 and closes July 7, 2015.

  • P-2924

    Expiration date: 6/1/2015

    Public Notice P-2924 is issued for a proposed impoundment in Madison County, Missouri. The applicant, Mr. Mark Diamond, proposes to construct an approximate 30-acre private lake on property located southeast of Fredericktown. The project will result in the placement of fill into approximately 480 linear feet of perennial and intermittent tributaries. The project will also result in secondary impacts to approximately 3,950 linear feet of primarily intermittent stream channel, through conversion from stream to open water. Mr. Diamond proposes to offset the loss of stream channel associated with the impoundment through on-site preservation, restoration, and enhancement of approximately 13,155 linear feet of tributary channel. This Public Notice is open for comment for 21 days. All comments must be received no later than June 1, 2015.

  • P-2923

    Expiration date: 5/27/2015

    Budrovich Marine proposes to create an anchor fleet containing a maximum 48 barges, arranged in a 6 long by 8 wide configuration. The fleet would be located along the right descending bank of Mosenthein Island, at approximate Mississippi River Mile 185.8, in Madison County, Illinois. The Public Notice comment period is open May 6, 2015 and closes on May 27, 2015.