  • P-3023

    Expiration date: 6/27/2017

    The purpose of the proposed project is to construct a major shipping service distribution facility that is centrally located. The approximate 110-acre site is the location for the proposed 500,000 square-foot distribution center with associated infrastructure. Approximately 11.59-acres of wetland and open water will be permanently impacted by this project. The applicant proposes to purchase credits from the Rosedale Wetland Mitigation Bank (St. Charles County) to compensate for the unavoidable impacts to wetlands. The site is located in the southeast corner of the intersection of Spencer Road and Premier Parkway in St. Peters, Missouri. The proposed project is located within the Lakeside 370 Levee. The notice opens for comment June 6, 2017 and closes June 27, 2017.

  • P-2995

    Expiration date: 6/2/2017

    The applicant, The DESCO Group, seeks authorization to conduct grading and piping operations within waters of the United States to enclose two ephemeral unnamed tributaries, for the purpose of a commercial development for the community of Warrenton, Missouri. Project impacts include the piping enclosure of tributary A & B that bisects the site, consisting of 610 lineal feet of channel (330 (lf) Tributary A & 280(lf) tributary B). This will facilitate two new commercial buildings, parking areas and associated infrastructure such as roadways and detention basin.Written comments must be submitted by replying to this electronic mail message or by mailing them to the addresses shown in the public notice. The Public Notice comment period opens on May 11, 2017, and closes on June 2 2017.

  • P-2994

    Expiration date: 6/1/2017

    The applicant, Mr. Steven Petroff, in Madison, IL, seeks authorization to conduct excavation, grading and filling operations in waters of the United States. The applicant is proposing the creation of a 14.3 acre lake for public recreation which will impact approximately 12.69 acres of emergent wetland. Applicant proposes to mitigate these impacts on site via the conversion of 2.81 acres of emergent wetland, at a 2:1 ratio, into forested wetland and creating 2.41 acres, at a 31 ratio, of forested wetland. This will generate 12.81 acres of mitigation credit to offset the 12.69 acres of impact. Written comments must be submitted by replying by electronic mail or written mail to the address in the notice. The Public Notice comment period opens May 12, 2017 and closes June 1, 2017.

  • P-2993

    Expiration date: 5/22/2017

    The Westborough Country Club seeks authorization to conduct grading and bank stabilization operations in waters of the United States. The applicant is proposing a stream restoration and bank stabilization project along two areas of Gravois Creek. The downstream area is approximately 780 feet long and the upstream area is approximately 150 feet long. Written comments must be submitted by replying by electronic mail or written mail to the address in the notice. The Public Notice comment period opens May 1, 2017 and closes May 22, 2017.

  • P-2992

    Expiration date: 5/16/2017

    Missouri Department of Transportation, in cooperation with Illinois Department of Transportation and the Federal Highways Administration, seeks authorization, under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, to replace the Champ Clark Bridge in Pike County Missouri and Illinois, respectively. NOTE: The public notice also contains language for reviews of Section 401 of the Clean Water Act (IEPA), and Section 14 of the Rivers and Harbors Act of 1899 (33 U.S.C. § 408) (USACE). The project is located on US Highway 54 over the Mississippi River between Pike County, MO and Pike County, Illinois (Section 18, Township 54N, Range R1W) near Louisiana, MO. The project is located at River Mile 283.2 (approximate coordinates 39°27’24.71” N, 91°02’50.82” W). Written comments must be submitted by replying by electronic mail or written mail to the addresses shown in the signature block, below. The Public Notice comment period opens on April 25, 2017, and closes on May 16, 2017.