Regulatory

Redirecting...

Public Notices

  • 2000-670

    Expiration date: 3/29/2024

    The applicant, Ameren Missouri, requests to modify permits issued previously that authorize activities such as barge mooring facilities, mooring cells, and water intake structures associated with the Ameren Meramec Plant. Since the Ameren Meramec Energy Center is being decommissioned, the permittee is required to remove previously authorized infrastructure, however, they wish to leave certain infrastructure in place. This request would allow certain selective demolition activities at the Ameren Meramec Energy Center, while keeping other permitted activities in place. The public notice details what is to be removed and what would remain. The project is located in the 05, Township 02 South, Range 11 West, St. Louis County, Missouri. The proposed activities would be conducted along the right descending bank of the Mississippi River between approximate river miles 160.9 to 161.7, above the confluence of the Ohio River. The Public Notice comment period is open from March 07, 2024 through March 29, 2024.

  • 1985-8503165

    Expiration date: 3/4/2024

    Bruce Oakley Inc., requests permit reauthorization to conduct periodic maintenance dredging of up to 10,000 cubic yards of accumulated river sediment from areas beneath and adjacent their existing loading dock with associated open river disposal. The project area is located near the right descending bank of the Mississippi River, at approximate river mile 182.9, in the City of St. Louis, St. Louis County, Missouri. The comment period is from February 13, 2024 through March 4, 2024.

  • 2023-704

    Expiration date: 12/31/2023

    The applicant, American River Transportation Co. (ARTCO), proposes two fleets, up and downstream of the Merchants Bridge in St. Louis County, Missouri, respectively. Both proposed fleets will be 5 barges wide by 3 barges long, for a total of 15 barges each (including captive barges). The project is located in Section 05, Township 02 South, Range 11 West, St. Louis County, Missouri. The proposed activities would be conducted along the right descending bank of the Mississippi River at approximate river mile 183.3, above the confluence of the Ohio River.

  • 2018-351

    Expiration date: 10/25/2023

    Applicant seeks to modify impacts previously authorized in January of 2020. The proposed project includes the construction of a 94-acre development near the intersection of Interstate 55 and Illinois Highway 143 in Edwardsville, Illinois. The project will include the construction of a retail/commercial development, along with associated roadways and infrastructure. The original authorization was for a 24-acre development – while the current proposal seeks to develop the entire parcel to support the adjacent sports park. The project is in Section 20, Township 4 North, Range 7 West, 3rd Principal Meridian, Madison County, Illinois. Latitude: 38.793496, Longitude: -89.899679. The Public Notice comment period is open from October 4, 2023 through October 25, 2023.

  • Missouri Stream Mitigation Method 2023

    Expiration date: 8/31/2033

    With this notice, the Corps is announcing the final September 2023 MSMM and will begin using it immediately subject to the transition provisions described below.