• P-2905

    Expiration date: 1/8/2015

    Williamson Energy, LLC seeks authorization to construct a new refuse disposal facility to provide service to the Pond Creek Mine No. 1 (Mine 1.0. No. 11-03141, IDNR Permit No. 375) preparation plant facilities located west of the proposed refuse facility. The new refuse cell will be identified as East of Dwina Refuse Disposal Facility No. 3 (Impoundment I.D. No. IL08-03141-02). The project area is located 5 miles northwest of Johnston City, Illinois. More specifically, in Section 12, Township 08 South, Range 03 East of the 3rd Principle Meridian, Williamson County, Illinois. Latitude: 37.842231°, Longitude: -88.812933°.

  • P-2914

    Expiration date: 1/5/2015

    Transload Realty, LLC, requests authorization to install a barge loading and unloading dock along the left descending bank of the Mississippi River, at approximate river miles 183.1, in Venice, Madison County, Illinois. The Public Notice comment period opens on December 16, 2014 and closes January 5, 2015.

  • P-2909

    Expiration date: 1/5/2015

    ADM requests authorization to install two 35-feet by 195-feet deflection barges immediately upstream of their existing St. Louis barge loading dock. The project site is proposed along the right descending bank of the Mississippi River, at approximate river miles 184.0, in St. Louis, St. Louis County, Missouri. The Public Notice comment period opens on December 16, 2014 and closes January 5, 2015.

  • P2907 P2908

    Expiration date: 12/31/2014

    Holcim requests authorization to modify an existing fleet and to create an additional fleeting area along the right descending bank of the Mississippi River, at approximate river miles 138.4 and 138.0, in Ste. Genevieve County, Missouri. The Public Notice comment period opens on December 11, 2014 and closes December 31, 2014.

  • P-2912

    Expiration date: 12/30/2014

    The applicant, Great Rivers Greenway, is seeking authorization to conduct grading and filling operations within waters of the United States for Phase II of the McKelvey Woods Greenway Trail Project. The project consists of an approximate 2-mile long paved trail. Construction of the trail will impact five wetlands and includes impacts to three streams. The project is located in the City of Maryland Heights, south of Creve Coeur Mill Road and east of Maryland Heights Expressway. The trail starts at Marine Avenue and proceeds east over FeeFee Creek. The project is located in Section 17, Township 46 North, Range 5 East, St. Louis County. The Public Notice opens December 10, 2014 and closes December 30, 2014.