Official websites use .mil
Secure .mil websites use HTTPS
Rio Guanajibo Validation Study Review Plan
Rio Guanajibo Supplemental Project Review Plan
Melvin Price Locks and Dam Main Lock Lift Gate Replacement Project
Melvin Price Locks and Dam Main Lock Overlook Alterations Project
Review Plan for Wappapello Lake (MO30204) – IES
Review Plan for the Alton to Gale Organized Levee Districts
Review Plan for the Alton Pool Island Restoration
Review Plan for the Bois Brule Levee and Drainage District
Review Plan for the Cape Girardeau Flood Protection System Reconstruction
Review Plan for the Chain of Rocks Ditch Work Phase II
Review Plan for the Clarence Cannon National Wildlife Refuge
Review Plan for the East St. Louis, IL Flood Protection Project
Review Plan for the Godar Glades Wetland Complex
Review Plan for the Harlow and Open River Islands HREP
Review Plan for the Kaskaskia River Basin Feasibility Study
Review Plan for the Lake Lou Yeager Aquatic Ecosystem Restoration
Review Plan for the Lock 27 Major Rehabilitation
Review Plan for the Melvin Price Wood River Under Seepage
Review Plan for Metro East St. Louis Levee Systems Modification (Section 408)
Review Plan for the Monarch Chesterfield Levee
Review Plan for the Monarch Chesterfield Semi Quantitative Risk Assessment
Review Plan for the Nutwood Drainage and Levee District
Review Plan for Piasa and Eagle's Nest Islands
Review Plan for the Prairie Du Pont Levee & Sanitary District & Fish Lake Drainage and Levee District Underseepage Design Deficiency Correction Study
Review Plan for the Regulating Works Supplemental Environmental Impact Statement (SEIS)
Review Plan for the Rio Grande de Arecibo Supplemental Project
Review Plan for the Rip Rap Landing Habitat Rehabilitation and Enhancement Project
Review Plan for Routine Operations and Maintenance Products
Review Plan for the Spunky Bottoms Ecosystem Restoration (Section 1135)
Review Plan for St. Louis Flood Protection
Review Plan for the St. Louis Riverfront, Missouri and Illinois, Meramec River Ecosystem Restoration
Review Plan for Sainte Genevieve Missouri
Review Plan for the Ted Shanks Conservation Area Habitat Rehabilitation and Enhancement Project
Review Plan for the Wood River Design Deficiency Correction Project
City of O’Fallon Wastewater Treatment Plant CAP 14 Draft Feasibility Report
Bois Brule Levee and Drainage District, Missouri
CAP 14 County Road 228
CAP 14 Fayette County HWY 23
CAP 14 Ofallon Sewage Lagoons
CAP 14 Salt River
CAP 14 St Louis City Waterlines
CAP 14 Wildwood
CAP 205 Festus Crystal City Plus Amendments
CAP 205 Prairie du Rocher
CAP 206 Ted Shanks
CAP 1135 Rend City Wetlands
Cape Girardeau Reconstruction
East St. Louis Design Deficiency PPA
Madison-St. Clair Belleville
Madison-St. Clair Eagle Park Acres
Madison-St. Clair East St. Louis CSO
Madison-St. Clair Glen Carbon
Missouri River Levee System Unit L-15
Monarch Chesterfield
St. Louis CSO Harlem-Baden
ST. Louis CSO Old Mill Creek Plus Amendments
St. Louis CSO Vandeventer to Grand and South Arsenal
St. Louis Flood Protection
Wood River Design Deficiency
- Wood River Design Deficiency Amendment 1
Wood River Grassy Lake Pump Station Base
Wood River Grassy Lake Pump Station REV-1
Wood River Reconstruction
Executed FCSA STL Riverfront Meramec River Ecosystem Restoration
FCSA Kaskaskia River Basin , IL
FCSA Lake Lou Yeager , IL
LCA Lower Meramec River Basin, Valley Park, MO
Main Report
Appendices
Review Plan: River Des Peres University City General Reevaluation Report with Environmental Assessment
Approval Memo: River Des Peres University City General Reevaluation Report with Environmental Assessment
St. Louis Riverfront - Meramec River Basin Feasibility Study Final Report - Main Report
St. Louis Riverfront - Meramec River Basin Feasibility Study Final Report - Appendices
St. Louis Riverfront - Meramec River Basin Signed Chief's Report
Alton to Gale Organized Levee Districts, IL and MO IEPR Review Panel Report
East St. Louis Flood Protection Design Deficiency Correction, IL IEPR Review Panel Report
Melvin Price-Wood River Underseepage, IL IEPR Review Panel Report
Middle Mississippi River Regulating Works SEIS Final IEPR Report
Prairie du Pont and Fish Lake Flood Design Deficiency Correction, IL IEPR Agency Response
Prairie Du Pont and Fish Lake Flood Design Deficiency Correction, IL IEPR Review Panel Report
Wood River Levee System Design Deficiency Correction, IL IEPR Review Panel Report
Wood River Levee System Design Deficiency Correction, IL IEPR Agency Response
East St. Louis Flood Protection Design Deficiency Correction, IL IEPR Agency Response
Whitley Creek Area Sediment Management Project
West Alton Islands HREP
Island Creation Pilot Project
Proposed Land Acquisition Service Base
Piasa and Eagles Nest Island HREP Supplemental Environmental Assessment
Wappapello Lake Forest Stand Improvement Project 2021
Regulating Works Project Dogtooth Bend Phase 7 Draft Environmental Assessment
2022 Draft EA and FONSI for Gilbert Island Forestry Management
Wood River Sewer Separation Project
St. Louis, MO Combined Sewer Overflow Rehabilitation Project
Cahokia Heights Sewer Rehabilitation Project
2021 DRAFT EA AND FONSI for Rend Lake Forest Stand Improvement Actions
Wappapello Lake Lakeside Marina Expansion Project
Chouteau Island 2019 PL 84-99 EA and FONSI
Augusta Bottom 2019 PL 84-99 EA and FONSI
Moore's Towhead Mitigation Plan
PL84-99 Darst Levee Repair 2019
NESP Twin Islands Draft Report
Dogtooth Bend Emergency Construction Draft EA
Draft EA Kuhs Levee Repair PL84-99
Minion Point Flexpipe BiOp EA 2020
Draft EA MTL South Fork Island Erosion Protection
BREVATOR LEVEE SYSTEM EMERGENCY FLOOD DAMAGE REPAIR
Elsberry/King’s Lake PL 84-99 EA 2019 Flood
Bluffdale Farms PL84-99 2019 Repairs Draft EA
Elm Point PL 84-99 EA 2019 Flood
Wappapello Lake Hwy D Road Relocation
Sainte Genevieve #2 PL 84-99 2019 Draft EA
Bois Brule Levee Borrow Area Supplement EA
Rend Lake 36-Inch Water Main Final EA Oct 2018
Belleville, IL CSO EA
Wood River, IL CSO EA
Draft Carlyle Lake Road Relocation EA
Carlyle Lake Shoreline Erosion EA
DRAFT EA - Augusta Bottoms Levee PL 84-99 2017 Repairs
DRAFT EA - Shelbyville Private Road Real Estate Land Easements
DRAFT EA - Ameren USACE Land Exchange
Lower Wood River Design Deficiency Corrections SEA
Jerry F Costello Lock and Dam Scour Repair EA
Red Rock Landing Phase 6 Draft Environmental Assessment
Regulating Works Project - Draft Supplemental EA
USACE-USFS Land Interchange, Wappapello Lake, MO
Mud Creek EA and FONSI 2015 and 2017 PL 84-99 Repairs
RPO Forest Management EA and FONSI
DRAFT Elm Point EA and FONSI PL 84-99 2015 Repairs
Burnham Island Sandbar Creation Project
EA for Ste. Genevieve County Levee District Repair Work under PL 84-99
Carlyle Lake Nature Trail Draft EA Nov 2016
DRAFT Foley EA and FONSI PL 84-99 2015 Repairs
Howard Bend Levee District EA and FONSI
Lakeside 370 Draft EA and FONSI PL 84-99 2015 Repair
EA and FONSI Chouteau Island D&LD PL 94-99 Repairs
Kuhs Levee District Repairs PL 84-99 DRAFT EA and FONSI
Regulating Works Grand Tower Phase 5 Final
Regulating Works Dogtooth Bend Phase 6 Final EA
Acquisition of Inholding Land Parcels Wappapello Lake Project Draft Environmental Assessment
Environmental Assessment - Brevator Drainage District Levee Repairs
Wood River Levee System Limited ReevaluationReport Design Deficiency Corrections Environmental Assessment
Boston Bar Side Channel Restoration & Island CreationProject Draft Environmental Assessment
Draft EA - Melvin Price Reach of the Wood River Levee Underseepage Design Deficiency Corrections Project
Mosenthein Ivory Landing Phase 5 Final EA and FONSI with Appendices
Lock and Dam 25 Overflow Dike Scour IRRM Draft EA and Unsigned FONSI
Cora Island Missouri River Recovery Project - Project Implementation Report with Integrated Environmental Assessment
Eliza Point Greenfield Bend Phase 3 Final EA FONSI and Appendices
Revision of the Wappapello Lake Water Control Plan, St. Francis River Basin - Final Environmental Assessment with Signed FONSI
Port of East St. Louis Environmental Assessment - Main Report
App A - Location and Project Maps
App B - Alternatives
App C - EcoCat
App D - Wetland and Waterbody Delineation East St. Louis
App E - Wetland and Waterbody Delineation North Cahokia Tract
App F - Wetland Delineation St. Clair County
App G - Wetland Impacts
App H - Cultural Resources East St. Louis
App I - Cultural Resources North Cahokia Tract
App J - Preliminary Environmental Site Assessment East St. Louis
App K - Preliminary Environmental Site Assessment North Cahokia Real Estate Project
App L - Agency Coordination Letters
Appendix A - Engineering
Appendix B - Hydrology and Hydraulics
Appendix C - Costs
Appendix D - Economics
Appendix E - Real Estate Plan
Appendix F - Environmental Assessment and FONSI
Appendix G - Plan Formulation
Appendix H - Public Involvement