Regulatory Division

Additional Information

Online commenting is available for active Public Notices through the Regulatory Request System

Expired Public Notices can be requested via the Freedom of Information Act

Regulatory Public Notices

The purpose of the public notice process is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity seeking authorization from the USACE. Responses preferred to be submitted through RRS or can be submitted via email or mail to the District.
 
Expand List item 41358Collapse List item 41358  More Information

 

The USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Tribal Nations; and other interested parties in order to consider and evaluate the impacts of  proposed activity by applicants. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for proposed activities. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any comments or objections which are received during this period may be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested permit. Please note that all comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act.

Results:
Archive: September, 2025
Clear
  • Missouri Regional General Permit (RGP) 45

    The U.S. Army Corps of Engineers, St. Louis District, HAS ISSUED GP-45, authorizing the discharge of dredged or fill material associated with activities designed to improve water quality, improve fish and wildlife habitat, maintain recreational value, and extend the lifespan of man-made lakes and ponds. This permit authorizes the removal and discharge of lakebed/pond sediment in conjunction with mechanical dredging, hydraulic dredging (including return water from such activities) and excavation activities. The use of standard construction equipment to remove accumulated sediment is authorized by this permit. The dredged/excavated material may be used in the construction of jetties/breakwaters, shoreline stabilization structures, fish and wildlife habitat improvement structures and other similar activities. This regional general permit is issued under the authority of Section 404 of the Clean Water Act (33 USC 1344). It does not obviate the need for project proponents to obtain other Federal, state, or local authorizations. DURATION OF THE GENERAL PERMIT: The GP-45 has been issued and is in effect for a period of five years from the issue date of (September 15, 2025), unless it is specifically modified, suspended, or revoked prior to the expiration date.