Regulatory Division

Additional Information

Online commenting is available for active Public Notices through the Regulatory Request System

Expired Public Notices can be requested via the Freedom of Information Act

Regulatory Public Notices

The purpose of the public notice process is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity seeking authorization from the USACE. Responses preferred to be submitted through RRS or can be submitted via email or mail to the District.
 
Expand List item 41358Collapse List item 41358  More Information

 

The USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Tribal Nations; and other interested parties in order to consider and evaluate the impacts of  proposed activity by applicants. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for proposed activities. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any comments or objections which are received during this period may be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested permit. Please note that all comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act.

Results:
Tag: regulatory division
Clear
  • MVS-2025-395

    Expiration date: 2/6/2026

    A Public Notice has been issued for the proposed establishment of the Olive Branch Mitigation Site. The Sponsor, Naturion West, LLC, requests approval for this site under their approved Umbrella Mitigation Banking Program Instrument (File Number: MVS-2020-652). As proposed, the Olive Branch Mitigation Site would generate 30.3 wetland credits. The Sponsor intends to restore several habitat types, including 3.0 acres of hardwood bottomland forest, 10.8 acres of cypress/tupelo swamp, and 16.5 acres of emergent wetland habitat. The project site includes approximately 35.4 acres located within the floodplains of the Mississippi River and the historic Cache River Basin in Alexander County, Illinois. The specific coordinates are Latitude: 37.161234°, Longitude: -89.385067°. The Public Notice comment period is open from January 7, 2026, through February 6, 2026.

  • Notice of Availability of the Regional Streamflow Duration Assessment Methods for the Northeast and Southeast

    The U.S. Army Corps of Engineers (Corps) Baltimore, Buffalo, Charleston, Chicago, Detroit, Fort Worth, Galveston, Huntington, Jacksonville, Kansas City, Little Rock, Louisville, Memphis, Mobile, Nashville, New England, New Orleans, New York, Norfolk, Philadelphia, Pittsburgh, Savannah, St. Louis, Tulsa, Vicksburg, and Wilmington Districts, and the U.S. Environmental Protection Agency (EPA) Regions 1, 2, 3, 4, 5, 6, and 7 jointly announce the availability of the Regional Streamflow Duration Assessment Methods (Regional SDAMs) for the Northeast and Southeast (dated June 12, 2025). The methods are rapid assessment tools to help distinguish between ephemeral, intermittent, and perennial streamflow at the reach scale for the Northeast and Southeast SDAM Regions.