Iowa Army Ammunition Plant Administrative Record

Welcome to the IAAAP Administrative Record page.

IAAAP Admin Record: OU-1 (non-radiological contamination)

The U.S. Army Corps of Engineers (USACE) is executing a U.S. Army Record of Decision (ROD) for Operable Unit (OU)-1. The OU-1 administrative record is available at https://iaaaprestoration.com/adminrecord.

IAAAP FUSRAP Admin Record: OU-8 (radiological contamination)

 Volume One

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

 

Archive Search – Historical Records, including DOE FUSRAP Site Designation

 

 

 

3779

Letter, subject: DOE Site Designation

US DOE

USACE

03/2000

3779

Amendment  No. 2 to Permit No. DA-25-066-ENG-11073

US Army

 

10/1971

3779

Letter, subject: DOE Identification of sites that may be  radiologically contaminated as a result of DOE predecessor operations

US DOE

Office of the Deputy Assistant Secretary of Defense for Installations Pentagon

05/1987

3779

Radioactive Contamination Clearance Report for the Burlington ERDA Facility

US Energy Research and Development Administration

Real Estate & Maintenance Management Branch

04/1975

2679

ORNL/TM-2000-/305, Results of the Indoor Radiological Survey of the Iowa Army Ammunition Plant, Middletown, Iowa

US DOE- Oak Ridge

 

07/2001

3282

Radiological Condition Surveys of Real Property at Burlington, Iowa

Mason & Hanger-Silas Mason Co., Inc.

Burlington ERDA Plant

03/1975

 

 

 

 

 

 

Site Descriptions and Chronologies

 

 

 

6896

Iowa Ordnance Plant History, Vol. 1, Including Maps, Physical Characteristics, Operating Organizations, Plant Operations, Production Results, Plant Design and Construction History, and Production Statistics

 

 

 

6895

Secret Project History of Line I Operations, Atomic Energy Commission, Contract w-49-010-ORD-68 at Iowa Ordnance Plant, 1 January 1947 – 1 July 1954, Operating Contractor Silas Mason Company, Engineers and Contractors, Burlington, Iowa – Including Project Design and Construction, Project Expansion, Expanded Production Operations, and Ordnance Administration Relative to Manufacture of High Explosive Components for MK5 and MK7 Nuclear Weapons

 

 

10/1965

6891

Secret Project History of Line I Operations, Atomic Energy Commission, Contract w-49-010-ORD-68 at Iowa Ordnance Plant, 1 July 1954 – 31 December 1954, Operating Contractor Silas Mason Company, Engineers and Contractors, Burlington, Iowa – Including Ordnance Administration, Contract Administration, Engineering Division, Program Inspections, Production and Plant Safety and Security

 

 

4/1955

6924

Project History of Line 1 Operations Contract W-49-010-ORD-68 at Iowa Ordnance Plant 1 January 1956 – 30 June 1956, Operating Contractor Mason and Hanger-Silas Mason Co. Inc., Engineers and Contractors, Burlington Iowa

 

 

8/1956

6000

IAAAP Installation Action Plan – FY 2005

IAAAP

 

2005

 

1.6 Interagency Agreements

 

 

 

6892

MOU between DOE and USACE

 

 

 

5187

Federal Facility Agreement Under CERCLA Section 120, Administrative Docket Number: CERCLA-07-2005-0378

USEPA, USACE,

US DOE and the State of Iowa

 

10/2006

5280

FFA: Request for Extension of RI Field Work and Submittal of Draft RI Report

USACE

Multiple

5/2007

5370

FFA: Concurs with Request for Extension for Completion of RI Field Work and Submittal of Draft RI Report

USEPA Region VII

USACE

6/2007

5365

FFA: Concurs with Request for Extension for Completion of RI Field Work and Submittal of Draft RI Report

Iowa Department of Public Health

USACE

5/2007

5529

FFA: Request for Extension of Submittal of Draft RI Report

USACE

Multiple

1/2008

5583

FFA: Concurs with Request for Extension of Draft RI Report

USEPA Region VII

USACE

2/2008

5562

MOA: Identification of IAAAP Project Manager

US Army – IAAAP

USACE

2/2008

5617

FFA: Notice of Review Period Extension for EPA Review of Draft RI Report

USEPA Region VII

USACE

3/2008

5633

FFA: Review Period Extension for EPA Review of Draft RI Report

USEPA Region VII

USACE

4/2008

5657

MOA: Designation of New IAAAP Project Manager for FUSRAP Coordination

USACE

US Army – IAAAP

5/2008

5895

FFA:Request for Extension for Submittal of Draft Final RI Report

USACE

USEPA Region VII

6/2008

5894

FFA: Request for Extension for Submittal of Draft Final RI Report

USACE

USEPA Region VII

7/2008

5893

FFA: Concurs with Request for Extension of Draft Final RI Report

USEPA Region VII

USACE

7/2008

 

 

 

 

 

 

Federal, State, Local Technical Records

 

 

 

3261

Health Consultation:

Iowa Army Ammunition Plant Middletown, Des Moines County, Iowa

 

ATSDR

 

03/2001

3953

Health Consultation:

Public Comment Release

Environmental Pathway Evaluation for Beryllium and Depleted Uranium

ATSDR

 

08/2003

4272

Health Consultation:

Environmental Pathway Evaluation for Beryllium and Depleted Uranium

ATSDR

 

12/2003

3083

EPA Superfund Interim Record of Decision, Iowa Army Ammunition Plant, OU1, Middletown, Iowa, PB98-964305, EPA 541-R98-168

 

 

3/1998

 Volume Two

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

 

1.9 Preliminary Assessments

 

 

 

501

Memorandum, subject: Site Visit to IAAAP 11/28/00

USACE – Omaha

(CENWO-HX-H)

 

12/2001

1047

Transmittal of Draft Final Iowa Army Ammunition Plant Scoping Survey Plan for Firing Sites 6 and 12

USACE

Multiple

4/2001

1041

 

Draft Final Iowa Army Ammunition Plant Scoping Survey Plan For Firing Sites 6 and 12

USACE

 

3/2001

1094

Response to Comments on the Draft Final IAAAP Scoping Survey Plan for Firing Sites 6 and 12

USACE

EPA

4/2001

1091

Response to Comments on the Draft Final IAAAP Scoping Survey Plan for Firing Sites 6 and 12

USACE

IAAAP

4/2001

1092

Transmittal of Final Iowa Army Ammunition Plant Scoping Survey Plan for Firing Sites 6 and 12

USACE

EPA

4/2001

1093

Iowa Army Ammunition Plant Scoping Survey Plan for Firing Sites 6 and 12, Final

USACE

 

4/2001

2800

Transmittal of Draft Preliminary Assessment for the Iowa Army Ammunition Plant, Middletown, Iowa

USACE

Multiple

09/2001

3035

Transmittal of Final Preliminary Assessment for the Iowa Army Ammunition Plant, Middletown, Iowa

USACE

Multiple

01/2002

2973

Final Preliminary Assessment Iowa Army Ammunition Plant Middletown, Iowa

USACE

 

12/2001

 

 

 

 

 

 

Site Inspection Documents

 

 

 

5723

Transmittal Letter: Rev A: Summary of Radiological Survey Findings

USACE

IAAAP

12/2004

4624

Letter: forwarding Draft Summary of Radiological Survey Findings

USACE

Mult.

2/2005

4625

Letter: Draft Final, dated May 24, 2005, Summary of Radiological Survey Findings for IAAAP

USACE

Mult.

5/2005

4993

Letter: Routing Rev B dated March 24, 2006 of the Summary of the Radiological Survey Findings for IAAAP

USACE

Mult.

3/2006

5062

Letter: forwarding "Final" version of Summary of RAD Survey Findings at IAAAP, dated June 6, 2006

USACE

Mult.

6/2006

5063

(Marked Rev 0): Summary of RAD Survey Findings for IAAAP, dated June 6, 2006

USACE

Mult.

6/2006

 

 

 

 

 

 

IAAAP Site-wide Aerial Survey

 

 

 

2933

Letter and Attachment: Detection of Depleted Uranium and Cesium 137 Using AMS Bell 412 aerial Survey System and the Kiwi Ground Survey System

USEPA

 

11/2001

3216

Letter and Attachment: Report regarding the utility and justification for a radiological survey of the entire IAAAP site as requested in Senate Report 107-39

US Army – Office of the Assistant Secretary for Civil Works

Multiple

6/ 2002

 Volume Three

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

 

IAAAP Site-wide Aerial Survey

 

 

 

3376

Letter: Enclosing Copies of Aerial Radiological Work Plan for Comment

USACE

Mult.

9/2002

6918

Transmittal of Aerial Radiological Survey Work Plan (Draft Final)

USACE

Mult.

9/ 2002

6907

IAAAP Aerial Radiation Survey Final Work Plan

IAAAP

USEPA

10/2002

6926

IAAAP Aerial Radiological Survey

USACE

Mult

7/2003

4051

Memo: forwarding Final IAAAP Radiological Survey Report (became Final 8/21/03)

IAAAP

Army (Mult.)

8/2003 (but typo shows as 8/2002)

7073

Email: Clarification that the Draft Final Aerial Radiological Survey Report dated July 10, 2003 is also the Final Report.

Multiple

Multiple

9/2011

 

IAAAP Reconnaissance Survey for Buildings L-37-1, L-37-2, L-37-3

 

 

 

3448

Letter, subject: FUSRAP Use of Data Generated During the Site Reconnaissance Survey of Yard L Warehouses L-37-1, L-37-2, and L-37-3 at the IAAAP

USAEC

Multiple

1/2003

3445

Transmittal of Draft Rev. A IAAAP Reconnaissance Survey for Buildings 11-37-1, 11-37-2, 11-37-3 dated January 2003.

USACE

Multiple

1/2003

3513

Letter and Attachments: Final Reconnaissance Survey for Buildings L-37-1, L-37-2, L-37-3, Rev. 0

USACE

Multiple

2/2003

3518

Letter and Attachment: Errata Page for Final IAAAP Reconnaissance Survey for Buildings L-37-1, L-37-2, L-37-3, Rev. 0.

USACE

Multiple

2/2003

3526

Transmittal of Draft IAAAP Site Reconnaissance Survey Report for Buildings L-37-1, L-37-2, L-37-3, dated February 2003

USACE

Multiple

2/2003

3915

Transmittal of Final IAAAP Site Reconnaissance Survey Report for Buildings L-37-1, L-37-2, L-37-3, dated March 2003.

USACE

Multiple

4/2003

7072

Final IAAAP Site Reconnaissance Survey Report for Buildings L-37-1, L-37-2, L-37-3, dated March 2003.

USACE

Multiple

3/2003

4300

Letter and Attachment: Final IAAAP Radiological Screening Plan

USACE

Multiple

8/2004

 

 

 

 

 

 

IAAAP Radiological Survey Plan for Yard C, Yard G, Yard L, Warehouse 3-01, and Line 1

 

 

 

5018

Transmittal: IAAAP Radiological Survey Plan for Yard C, Yard G, Yard L, and Warehouse 3-01 and Line 1 (Red Sites Document) dated April 12, 2006

USACE

Multiple

4/2006

5017

Final IAAAP Radiological Survey Plan for Yard C, Yard G, Yard L, and Warehouse 3-01, and Line 1, Rev. 0

USACE

 

4/2006

 

 

 

 

 

 

 IAAAP RI Work Plan

 

 

 

5039

Transmittal Letter for Draft IAAAP RI Work Plan for Line 1, Firing Sites areas, Yards C,G, and L, Warehouses 3-01 and the West Burn Pads Area South of the Road

USACE

Multiple

5/2006

5157

IDNR “no comment” reply

IDNR

Multiple

11/2006

5249

Transmittal letter for RI Work Plan, Final Draft

USACE

Multiple

2/2007

5249 Currently working on fixing this link.

IAAAP RI Work Plan for Line 1, Firing Sites areas, Yards C,G, and L, Warehouses 3-01 and the West Burn Pads Area South of the Road – Draft Final

USACE

Multiple

2/2007

5259

Letter: IDNR Concurrence with RI Work Plan

IDNR

USACE

3/2007

5439

Package to update “draft final” document to “Final”

USACE

Multiple

9/2007

7068

RI Work Plan Reference Document List

 

 

 

 

 

 

 

 

 

RI Reports

 

 

 

5548

Transmittal letter for Draft RI Report

USACE

Multiple

2/2008

5569

Routing Letter to MVD: sending draft RI Report to MVD for review and comment

USACE

USACE

3/2008

5887

Transmittal letter for Draft Final RI Report

USACE

Multiple

7/2008

5887

IAAAP Remedial Investigation for Firing Sites Area, Yards C,E,F, G and L, Warehouse 3-01 and area West of Line 5B 

USACE

Multiple

7/2008

6925

FUSRAP St. Louis, Laboratory Quality Assurance Manual and laboratory Procedures Manual

SAIC

Multiple

1999

 

 

 

 

 

 

 

 

 

 

 Volume Four

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

6919

Sampling and Analysis Guide for the St. Louis Sites.

USACE

Multiple

9/2000

6923

Technical Project Planning Meeting Minutes, June 22-24 2005, Des Moines, Iowa

 

Multiple

2005

6920

IAAAP Summary of the Radiological Survey Findings for the Iowa Army Ammunition Plant Explosive Disposal Area, Inert Disposal Area, Demolition Area Deactivation Furnace, and Line 1 Former Waste Water Impoundment Area May 2005

USACE

Multiple

5/2005

5591

Baseline Ecological Risk Assessment IAAAP Volume 1 Main Report Appendices A-B

USACE

Multiple

10/2004

5591

Baseline Ecological Risk Assessment IAAAP Volume 2 Appendices C-M

USACE

Multiple

10/2004

 

Public Affairs/Community Relations

 

 

 

 

 

 

 

 

3005

RAB (Regional Advisory Board) FUSRAP PowerPoint presentation

USACE

RAB & public

5/2001

3006

RAB: FUSRAP PowerPoint

USACE

RAB & public

11/2001

3096

RAB: FUSRAP PowerPoint

USACE

RAB & public

3/2002

3270

Letter: IAAAP gets FUSRAP designation

USACE

Mult.

7/2002

3369

RAB: FUSRAP PowerPoint

USACE

Iowa public

9/2002

5731

PowerPoint: Aerial RAD Survey

IAAAP

Iowa public

11/2002

5730

PowerPoint: Aerial RAD Survey

IAAAP                                   

Iowa public

3/2003

5728

RAB: PowerPoint: Restoration Issues

IAAAP

Iowa public

8/2003

4369

Letter: request for historical information regarding the IAAAP

USACE

 Joe Shanahan

6/2004

4442

RAF: PowerPoint; Screening Survey Preliminary Results

USACE

Iowa public

9/2004

5733

Minutes for 9/16/04 RAB

RAB

RAB

9/2004

5734

RAB: PowerPoint

USAC E

Iowa public

11/2004

5736

RAB: PowerPoint: Update

USACE

Iowa public

1/2005

5732

Agenda: RAB 5/17/05

RAB

RAB

5/2005

7010

RAB: PowerPoint: RI Work Plan

USACE

RAB

7/2007

7011

RAB: PowerPoint: RI Preliminary Findings

USACE

RAB

10/2007

7012

RAB: PowerPoint: RI Preliminary Findings

USACE

RAB

4/2008

7002

Public Notice of the Proposed Plan

USACE

Iowa Public

4/2011

7006

What is Depleted Uranium Poster

USACE

Iowa Public

5/2011

7006

CERCLA Review Process Poster

USACE

Iowa Public

5/2011

7006

Proposed Plan Poster

USACE

Iowa Public

5/2011

7006

Feasibility Study Poster

USACE

Iowa Public

5/2011

7006

Radiation Basics Poster

USACE

Iowa Public

5/2011

7006

Public Meeting Welcome Poster

USACE

Iowa Public

5/2011

7006

Public Meeting Sign in Sheet

USACE

Iowa Public

5/2011

7006

Speaker Signup Sheet

USACE

Iowa Public

5/2011

7006

Comment Form

USACE

Iowa Public

5/2011

7006

Public Meeting Agenda

USACE

Iowa Public

5/2011

7006

IAAAP Feasibility Study Factsheet

USACE

Iowa Public

5/2011

7006

IAAAP Proposed Plan Factsheet

USACE

Iowa Public

5/2011

7006

Operational Range and Military Munitions Rule Factsheet

USACE

Iowa Public

5/2011

7006

What is FUSRAP Factsheet

USACE

Iowa Public

5/2011

7006

IAAAP Public Meeting Postcard

USACE

Iowa Public

5/2011

7004

IAAAP Proposed Plan Presentation

USACE

Iowa Public

5/2011

7005

IAAAP Public Meeting Introduction Slides

USACE

Iowa Public

5/2011

7003

IAAAP Public Meeting Transcript

USACE

Iowa Public

5/2011

 

 

 

 

 

 

Community Relations Plan

 

 

 

5082

IAAAP Community Relations Plan

IAAAP

USEPA & public

2/2001

6928

Community Involvement Plan Addendum Iowa Army Ammunition Plant FUSRAP Federal Facilities Agreement Areas, Middletown Iowa

USACE

Public

2/2011

 

 

 

 

 

 

Briefing Papers

 

 

 

3318

FUSRAP PowerPoint Program for Gov. Vilsack

USACE

Iowa Gov.

7/2002

5048

FUSRAP PowerPoint of FFA for Gen. Crear

USACE

USACE (MVD)

5/2006

 

 

 

 

 

 

Press Releases

 

 

 

6893

News Release

USACE

Press

 

3409

News Release

IAAAP

Press

10/2002

5737

News Release: tells site wide walkovers were completed in Aug. 16 & 26

USACE

Press

 

 

 

 

 

 

 

Correspondence

 

 

 

 

 

 

 

 

6894

Letter: DOE’s work at IAAAP & FUSRAP eligibility

DOE

IAAAP (Mult.)

10/2000

 

6888

Letter: Requesting RAD restriction level at IAAAP

IDPH

IAAAP

3/2001

1081

Letter: Regarding Flyover to test 17,000 acres

Iowa Governor

Sec. Army

4/2001

1120

Letter: Two efforts underway at IAAAP

U.S. Army

I owa

5/2001

2633

Memo: transferring IAAAP support to CEMVR

IAAAP

USACE (Mult.)

6/2001

2724

Letter: Corps to prepare FAD survey report on consultation with State of Iowa

Iowa

Multiple

8/2001

2826

Letter: Iowa’s authority relative to environmental remediation at IAAAP

Iowa DOJ

Mult.

10/2001

6889

Letter: complaining of Army not participating in meetings

Iowa Governor

Army

6/2002

3323

Letter: Thanking Army & USACE for undertaking site wide survey

Iowa

Mult.

8/2002

3327

Letter: Faxing copy of EPA letter requesting a meeting with interested stakeholders to resolve technical issues related to the initiation of FUSRAP at IAAAP

EPA

Mult.

7/2002

3307

Letter: re: meeting to discuss RAD assessment

Iowa

Mult.

7/2002

3226

Letter: Historical accounting of IAAAP

USACE

USEPA

7/2002

3351

Letter: re: funding for SOW to MVR

Iowa Governor

Army & USACE

8/2002

3360

Letter: RAD flyover & other issues USACE

USACE

USEPA

9/2002

6887

Letter: saying 1990 FFA at IAAAP does not pertain to FUSRAP

USACE

Iowa (Mult.)

9/2002

3428

Letter: Groupings of work after the aerial survey

USACE

IDPH

10/2002

6886

Letter: asking for access for a driving tour

USACE

IAAAP

9/2002

3449

Letter: List of AEC occupied buildings at IAAAP

AO (contractor)

Iowa

1/2003

4071

Letter: State of Iowa wanting to interpret flyover data

IDPH

USACE

4/2003

 

 

 

 

 

 

 

 

 

 

 Volume Five

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

 

 

 

 

 

 

Feasibility Study

 

 

 

6941

FUSRAP Feasibility Study Report for the IAAAP Revision B1 and FUSRAP Proposed Plan for the IAAAP Revision B transmittal letter dated 2/18/11

USACE

Multiple

2/2011

6949

Draft Final FUSRAP Feasibility Study Report for the IAAAP and FUSRAP Proposed Plan transmittal letter dated 3/31/11

USACE

Multiple

3/2011

6976

 

USEPA Draft Final Feasibility Study and Proposed Plan Concurrence letter

USEPA

USACE

4/2011

6976

DoE Draft Final Feasibility Study and Proposed Plan Concurrence email

DoE

USACE

4/2011

6976

IDPH Draft Final Feasibility Study and Proposed Plan Concurrence email

 

 

 

6977

Final Feasibility Study for the IAAAP  dated 4/22/11

USACE

Multiple

4/2011

6978

Final Proposed Plan for the IAAAP dated 4/22/11

USACE

Multiple

4/2011

7067

Feasibility Study and Proposed Plan Reference Document List

 

 

 

6890

IAAAP EPA CERCLA FFA Dispute of March 28, 2005, operable Unit 4 (OU4) Work Plan for Supplemental Remedial Investigation Statement of Dispute Resolution

USACE

Multiple

3/2005

6974

Conceptual Model and Process Descriptor Formulations for Fate and Transport of UXO

USACE

Multiple

2/1999

6958

Environmental Assessment Implementation of BRAC Actions at IAAAP, IA

USACE

Multiple

2/2007

6972

Federal Register notice Record of Decision for Long Term Management and Use of Depleted Uranium Hexafluoride

USDOE

Multiple

8/1999

6973

Soil Washing at the Ashtabula Environmental Management Project

USDOE

Multiple

1/2002

6971

Integrated Natural Resources Management Plan and Environmental Assessment

IAAAP

Multiple

5/2007

6970

2007 Groundwater Sampling Report for IAAAP Middletown, IA

IAAAP

Multiple

12/2007

6969

Explanation of Significant Differences for the Interim Action Record of Decision Soils Operable Unit OU-1  Addition of Environmental Protectiveness to the Remedy and Transfer of Sites From OU-4 to OU-1

IAAAP

Multiple

6/ 2008

6968

Technical Memorandum – Soil Treatment Results for Alkaline Hydrolysis in Trench 6 Inert Disposal Area

IAAAP

Multiple

7/2009

6967

Draft Final Offsite Groundwater Feasibility Study

USACE

Multiple

3/2004

6957

Iowa Army Ammunition Plant Army Defense Environmental Restoration Program – Installation Action Plan

US Army

Multiple

10/2008

6965

US. Army Center for Health Promotion and Preventative Medicine – Wildlife Toxicity Assessment for Thallium

US Army

Multiple

12/2007

6963

Installation Assessment of Iowa Army Ammunition Plant

US Army

Multiple

1/1980

 Volume Six

Document

No.

Title Description

Author

Affiliation

Recipient

Affiliation

Document

Date

6966

Revised Draft Final Five Year Review Report for IAAAP Middletown Iowa

IAAAP

Multiple

2/2006

6975

Supplemental Groundwater Remedial Investigation Report

USACE

Multiple

8/ 2001

7008

Multi Agency Radiation Survey and Site Investigation Manual (MARSSIM)

Multiple

Multiple

8/2000

7009

Cancer Risk Coefficients for Environmental Exposure to Radionuclides

USEPA

Multiple

9/1999

 

Record of Decision

 

 

 

7066

Record of Decision Reference Documents List

 

 

 

7057

IDNR letter to USACE deferring all ARARs (except disposal) to IDPH

IDNR

USACE

3/2011

7060

Letter: Transmittal of Draft Final FS and PP

USACE

Multiple

4/2011

6985

FUSRAP Record of Decision for the Iowa Army Ammunition Plant Revision B transmittal letter dated June 6, 2011

USACE

Multiple

6/2011

7065

Letter: Transmittal of Draft Final FUSRAP Record of Decision for the Iowa Army Ammunition Plant

USACE

Multiple

7/2011

7064

Letter: Acknowledgement of Comments for Draft Final FS and PP

USACE

DoE

7/2011

7053

Letter: EPA Concurrence with Draft Final Record of Decision

EPA

USACE

7/2011

7054

Email: Iowa Department of Public Health Concurrence with Draft Final Record of Decision

IDPH

USACE

8/2011

7044

Letter: US Fish and Wildlife Concurrence with IAAAP Biological Assessment

US FWS

USACE

8/2011

7069

Email: Transmittal of Supplemental Information for IAAAP Biological Assessment

USACE

US FWS

7/2011

7055

Biological Assessment of IAAAP FUSRAP Areas and Transmittal Letter

USACE

US FWS

6/2011

7071

Letter: Transmittal of Final IAAAP Record of Decision to EPA

USACE

EPA

8/2011

7074

Letter: Transmittal of Final Record of Decision signed by EPA

EPA

USACE

9/2011

7075

FUSRAP Record of Decision for the Iowa Army Ammunition Plant - Final

USACE

Multiple

9/2011

St. Louis District Sites

More about FUSRAP

Collapse All Expand All
 

FUSRAP Mission

Protect human health and the environment.

Execute the approved alternative for cleaning up the radioactive contamination above health-based cleanup guidelines.

Minimize adverse impacts on residents and area business operations.

Return sites for appropriate beneficial use.

 Contact Us


STLFUSRAP@usace.army.mil 
NOTE: This email account is checked on most weekdays.
If, instead of clicking the email address above, you type or copy and paste the email address into a new email message, check to see that the email address appears correctly in your message.

314-260-3905 

U.S. Army Corps of Engineers
St. Louis District 
FUSRAP Area Office
114 James S. McDonnell Blvd.
Hazelwood, MO 63042-3102

NOTE: Due to the COVID-19, FUSRAP Area Office in Hazelwood, Missouri, will be closed to visitors for the foreseeable future.