Regulatory Branch

Results:
Archive: September, 2017
Clear
  • P-3066

    Expiration date: 10/29/2017

    Flower and Fendler, seeks authorization, under Section 404 of the Clean Water Act, to conduct grading and filling activities in an unnamed tributary to Grand Glaize Creek for the construction of a single family home residential subdivision. The proposed single-family residential development will be located along Carman Road approximately 800 feet east of the intersection of Missouri Highway 141 within Unincorporated St. Louis County, Missouri. More specifically, the proposed project occurs in Section 6, Township 44 North, Range 5 East, within the Kirkwood Quadrangle in St. Louis County, Missouri. The Public Notice Comment period opens September 29, 2017 and close October 29, 2017

  • P3063 to P3065

    Expiration date: 10/11/2017

    WATCO Companies, LLC., seeks authorization, under Section 10 of the Rivers and Harbors Act, to establish (3) additional Barge Fleets just downstream from their current fleeting facilities at the Cora Barge Terminal. The proposed terminal is approximately 12 miles southeast of Chester, near Illinois Route 3, in Randolph County, Illinois. Written comments must be submitted by replying by electronic mail or written mail to the addresses shown in the signature block, below. The Public Notice comment period opens on September 20, 2017, and closes on October 11 , 2017.