Results:
Archive: 2018
Clear
  • P-3076

    Expiration date: 2/2/2018

    The applicant, Kirchner Properties Belleville LLC – d/b/a/KPNA, seeks to develop both a residential subdivision and commercial properties within the identified site, West of Illinois Route 127, North of Nashville, Washington County, Illinois. The preliminary development plan avoids any impacts to Dome Creek. The small lake as well as approximately 1300’ of the Northeast Branch of Dome Creek will be impacted by construction of a 3.5 acre lake on the northern edge of the property. The public notice comment period opens January 12, 2018 and closes February 2, 2018.

  • P-3074

    Expiration date: 1/31/2018

    WATCO Companies, LLC., seeks authorization, under Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act, to relocate a barge, upgrade an access walkway and liquids lines leading to their existing Cahokia Marine terminal liquids dock along the left descending bank of the Mississippi River, river mile 178.2 in Sauget, St. Clair County, Illinois. Written comments must be submitted by replying by electronic mail or written mail to the addresses shown in the signature block, below. The Public Notice comment period opens on January 10, 2018, and closes on January 31, 2018.

  • P-3073

    Expiration date: 1/31/2018

    America's Central Port District proposes to conduct periodic maintenance dredging to remove up to 100,000 cubic yards of accumulated silt from their Madison Harbor with associated open river disposal. The harbor is located along the left descending bank of the Mississippi River, at approximate River Mile 183.5, in Madison, Madison County, Illinois. The public notice comment period opens on January 10, 2018, and closes on January 31, 2018.