Regulatory Branch

Results:
Archive: 2014
Clear
  • P-2867

    Expiration date: 3/3/2014

    The applicant, APAC-Brickey's Stone, requests authorization under Section 10 of the Rivers and Harbors Act to create a 25 barge fleet arranged in a 5x5 configuration along the right descending bank of the Mississippi River, at approximate river mile 134.8, in Ste. Genevieve County, Missouri. Written comments must be submitted by replying to this email or by mailing the comments to the address shown in the signature block, below. The Public Notice comment period is open February 10, 2014 and closes on March 3, 2014.

  • P-2862

    Expiration date: 2/27/2014

    Mr. Greg Dolbeare of SIMCO (Sny Island Merchandising Company) proposed to create a grain barge loading facility and grain elevator along the left descending bank of the Mississippi River, at approximate river mile 282.3, near Rockport, Pike County, Illinois. The Public Notice comment period is open February 7, 2014 and closes on February 27, 2014.

  • Public Hearing February

    Expiration date: 3/7/2014

    The U.S. Army Corps of Engineers, St. Louis District (Corps), will hold a Public Hearing for two Draft Environmental Assessments (EAs) for river training structure construction activities (Regulating Works) for the Grand Tower Phase 5 Project and the Dogtooth Bend Phase 5 Project. Where and when: In the Library, at the Shawnee High School (Community Unit School District #84) in Wolf Lake, Illinois, February 19, 2014, at 7:00 p.m. Information on the projects, supporting documents, and maps will also be available for public inspection, February 19, 2014, from 6:00 p.m. to 7:00 p.m. in the library, prior to the public hearing.

  • P-2854

    Expiration date: 2/14/2014

    The Illinois Department of Transportation, Region 6, proposes to replace the bridge that spans the Illinois River in Meredosia, Illinois. The project involves removing and replacing the existing bridge at Meredosia carrying Illinois Route 104 over the Illinois River in Morgan County. A new structure will be built approximately 256 feet north (upstream) from the existing bridge. Once the new structure is built, the old structure will be removed in accordance with an approved removal plan. The impacts to waters of the United States (WOUS) include temporary impacts to 0.85 acres, and permanent impacts to 2.17 acres, for a respective total of 3.02 acres. The applicant has proposed to mitigate for project impacts at 1.5:1 ratio at the pre-approved LaGrange Mitigation Bank. The Corps will make a determination of appropriate mitigation, upon review of all submitted information. The purpose of the project is to provide transportation facility across the Illinois River that is reliable and meets current design standards. The proposed project site is located at Meredosia, in Pike and Morgan Counties, Illinois. The proposed work would occur on both sides, and over, the Illinois River in Section 6, Township 3 South, Range 1 West. The Public Notice opens January 24, 2014 and closes February 14, 2014.

  • P-2860

    Expiration date: 2/14/2014

    The Missouri Conservation Heritage Foundation – Stream Stewardship Trust Fund (Sponsor) has requested under their In-Lieu Fee (ILF) Program Instrument and corresponding amendment; approval for an ILF mitigation project (SSTF1001) pursuant to 33 CFR 332 and 40 CFR 230 Compensatory Mitigation for Losses of Aquatic Resource; Final Rule (Federal Register / Vol. 73, No. 70 Pages 19594-19705, April 10, 2008). The mitigation project consists of enhancing 475 linear feet of instream channel bank and restoring approximately 10.6 acres of riparian corridor. If approved by the Corps, the ILF project will have a total potential credit release of 9,100 stream credits that can be debited by Department of the Army permit recipients. The project is located within the Upper St. Francis/Castor River Ecological Drainage Unit, along Little Whitewater Creek, in Bollinger County, Missouri. The Public Notice opens January 15, 2014 and closes February 14, 2014.