Expiration date: 11/18/2013
The Eliza Point/Greenfield Bend Phase 3 Project proposes the construction of a rootless dike at Mississippi River Mile (RM) 3.0L and four bendway weirs at RM 2.6R, 2.5R, 2.3R, and 2.2R. Placement of rock training structures would provide a sustainable alternative to repetitive maintenance dredging. Fill material would consist of quarry run limestone consisting of graded “A” stone. The Eliza Point/Greenfield Bend Phase 3 Regulating Works Project is located in the Middle Mississippi River (MMR) between River Miles (RM) 2.0 and 3.0 in Mississippi County, Missouri and Alexander County, Illinois near the town of Cairo, Illinois.