The purpose of the public notice process is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity seeking authorization from the USACE. Responses preferred to be submitted through RRS or can be submitted via email or mail to the District.
 
Expand List item 41358Collapse List item 41358  More Information

 

The USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Tribal Nations; and other interested parties in order to consider and evaluate the impacts of  proposed activity by applicants. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for proposed activities. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any comments or objections which are received during this period may be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested permit. Please note that all comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act.

2021GP38IL

CEMVS-OD-F
Published Oct. 14, 2021
Expiration date: 11/4/2021

STATE OF ILLINOIS REISSUANCE OF REGIONAL GENERAL PERMIT MVRGP-38 – LINEAR TRANSPORTATION CROSSINGS IN WATERS OF THE U.S. WITHIN THE STATE OF ILLINOIS The U.S. Army Corps of Engineers, is proposing to reissue Regional General Permit GP-38 for Linear Transportation Crossings in Waters of the United States within the State of Illinois under the authority of Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section 404 of the Clean Water Act (33 USC 1344). Duration of this General Permit. The regional permit could be utilized for linear transportation projects that meet the current conditions of Nationwide Permit 14.  The regional permit would also authorize certain discharges of dredged or fill material that currently exceed the limitations of Nationwide Permit 14.

Comments concerning the Corps permit should be addressed to the District Engineer, US Army Corps of Engineers, Rock Island District, ATTN:  OD-P, Clock Tower Building -Post Office Box 2004, Rock Island, Illinois 61204-2004.  Mrs. Jackie M. Groves, (309/794-5351) may be contacted for additional information, and email Jackie.M.Groves@usace.army.mil. The comment period is open until Nov 4, 2021