Current Bi-Op Construction
Last Updated: 21 Feb 2024
River Mile |
Structure |
% complete |
|
|
|
298.1 R |
400 ft Notch |
|
261.3 R |
1000 ft Gradual Slope Revetment |
|
103.4 R |
400 ft Double Pile Dike |
|
103.3 R |
600 ft Pile Dike |
|
103.2 R |
600 ft Pile Dike |
|
103.1 R |
400 ft Pile Dike |
|
|
|
|
132.5 R |
120 ft Notch |
|
122.6L |
500 ft Notch |
|
24.8 R |
200 ft Notch |
|
24.75 R |
300 ft Notch |
|
12.4 R |
200 ft V-Shaped Notch |
|