Home > Missions > Recreation > Wappapello Lake

Latest News Releases

Wappapello Lake 2018 Event Calender
Upcoming special event for the 2018 Recreation Year at Wappapello Lake.
Published: 1/9/2018
U.S. Army Corps of Engineers to Hold Workshops
The St.Louis District U.S. Army Corps of Engineers is currently updating the Wappapello Lake Master Plan and the Shoreline Management Plan. The purpose for updating these plans is to bring them into compliance with current U.S. Army Corps of Engineers polices and regulations, update visitor use trends and obtain public input to ensure future activities are accomplished in an environmentally sustainable manner.
Published: 1/9/2018
Winter Drawdown Scheduled at Wappapello Lake
The U.S. Army Corps of Engineers at Wappapello Lake will begin annual winter drawdown from recreation pool to conservation pool starting December 15, 2017. In accordance with our water control plan, the pool is drawn down five feet, from 359.74 feet relevant to the National Geodetic Vertical Datum (NGVD) to 354.74 feet NGVD.
Published: 1/1/2018
Christmas Tree Recycling Available at Wappapello Lake
The U.S. Army Corps of Engineers offers a meaningful way to dispose of your used Christmas tree and provide habitat at the same time. The Corps of Engineers will be accepting Christmas trees from December 26, 2017 through January 19, 2018, at the Redman Creek Boat Ramp.
Published: 12/26/2017

Wappapello Lake

Ozark Trail Maps

The following links will take you to specific sections of the Wappapello Lake Section of the Ozark Trail. These maps were developed and are maintained by the Ozark Trail Association.

Mile 0 – 7

Mile 7 – 13

Mile 13 – 19

Mile 19 – 27

Mile 26 – 34

Contact

Address:
Wappapello Lake Project Office
10992 Highway T
Wappapello, MO 63966-9603

Phone:
Main: (573) 222-8562
24-Hour Information Hotline: (573) 222-8139
Toll-free: 877-LAKEINFO

MASTER PLAN SCHEDULE:

Jan 17, 2018 Public Meeting at Greenville Elementary School 4:00pm-7:00pm

Jan 18, 2018 Public Meeting at Bill Emerson Memorial Visitor Center 4:00pm-7:00pm

Feb 18, 2018 Public Comment Submission Period Ends

September 2018 Draft Master Plan Available for Public Comments

October 2018 Public Comment Submission Period Ends

Late November 2018 Final Draft Master Plan Completed

Late December 2018 Revised Final Draft Completed/Internal Review

February 2019 Final Wappapello Lake Master Plan Approved


Find us on Facebook

Follow us on Twitter