The purpose of the project is to relieve flooding, alleviate erosion and improve water quality in the area of Blackwood Lane and Parkdale Lane in St. Peters.  This project is referred to as the P-20 Blackwood-Parkdale Stormwater Channel Improvement.  The City desires to construct these improvements to provide flooding relief as recommended in the City’s Stormwater Master Plan.  This project includes channel improvements to two reaches, which include: removal of existing concrete flume, installation of rock grade controls, improvements to existing storm water pipe discharges into channels, creation of low flow channels, regraded stable banks, increased and creation of riparian corridor buffers and perpetual stewardship by the City.  The notice opens December 2 and closes December 23, 2016.