The U.S. Army Corps of Engineers, St. Louis District, in partnership with the Wood River Drainage and Levee District, will host a ribbon cutting ceremony to mark the completion of the Upper Wood River Levee Underseepage Design Deficiency Correction Project on June 20, at 9:30 a.m. at the East Alton No. 1 Pump Station in Alton, Ill.
The event will recognize the successful federal-local partnership and celebrate a major milestone in flood risk management for the region. The project enhances the safety and reliability of the levee system by addressing a known design deficiency and implementing features that control underseepage from the Mississippi River. Improvements include 80 new relief wells, a drainage collection system, and an access road.