September 13, 2016, Mark Twain Lake –The U.S. Army Corps of Engineers at Mark Twain Lake would like the recreating public to be aware that work will be done replacing knife gate valves at the Re-Regulation Dam from September 19 to September 24, 2016. As a result, the re-regulation pool level will be dropped to 517 NGVD for varying periods of time. Boaters should use caution and be aware of low water conditions during the time work will be occurring. If additional information is needed, contact the Mark Twain Lake Project Office at 573.735.4097 or email the Corps of Engineers at marktwaininfo@usace.army.mil.
Release no. 16-37