Mark Twain Lake Announces Review Period for Draft Project Master Plan

CEMVS-OD-J
Published Jan. 23, 2025
Updated: Jan. 23, 2025

January 23, 2025, Mark Twain Lake – The U.S. Army Corps of Engineers (USACE) at Mark Twain Lake announces the review period for the final draft of the Project Master Plan is January 24, 2025 through February 23, 2025  The Master Plan is available on the project website at https://www.mvs.usace.army.mil/Missions/
Recreation/Mark-Twain-Lake/Master-Plan-Update/.
    A Project Master Plan is defined by USACE as the strategic land use management document that guides the comprehensive management and development of all project recreational, natural, and cultural resources throughout the life of a Corps water resources development project.  In general, it defines “how” the resources will be managed for the public use and resource conservation.  The MP does not address specifics of regional water quality, shoreline management, or water level management.  Additionally, the operation and management of operational facilities (dam, gates, powerhouses, spillways, etc.) is not included.


Contact
Brian Falls
5737354097
brian.a.falls@usace.army.mil

Release no. 25-012