US Army Corps of Engineers
St. Louis District Website

Dredge Potter Repairs
Crew members from the Dredge Potter use airlift dredging process to remove mud from the top of the suction ladder during repairs to the ladder rigging, Nov. 19, 2014. While working on the Kaskaskia River, the Dredge Potter experienced a D-ring failure (a critical link in the suction ladder lifting chains).

Download Image: Full Size (3.79 MB)
Photo by: U.S. Army Corps of Engineers St. Louis District |  VIRIN: 141119-A-CE999-007.JPG