Regulatory Division

Additional Information

Online commenting is available for active Public Notices through the Regulatory Request System

Expired Public Notices can be requested via the Freedom of Information Act

Regulatory Public Notices

The purpose of the public notice process is to solicit comments from the public and information necessary to evaluate the probable impact on the public interest regarding the proposed activity seeking authorization from the USACE. Responses preferred to be submitted through RRS or can be submitted via email or mail to the District.
 
Expand List item 41358Collapse List item 41358  More Information

 

The USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Tribal Nations; and other interested parties in order to consider and evaluate the impacts of  proposed activity by applicants. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for proposed activities. To make this determination, comments are used to assess impacts to endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. All factors which may be relevant to the proposal will be considered including cumulative impacts thereof; among these are conservation, economics, aesthetics, general environmental concerns, wetlands, historical properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and in general, the needs and welfare of the people.

Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any comments or objections which are received during this period may be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested permit. Please note that all comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act.

MVS-2025-214

Regulatory Division
Published May 21, 2026
Expiration date: 6/18/2026

Pursuant to its Umbrella Mitigation Banking Instrument (UMBI), Naturion West, LLC aims to establish mitigation bank sites in multiple watersheds throughout the USACE St. Louis District in Missouri. The proposed Sunburst Stream Mitigation Bank (SSMB) is located in the floodplain of the Wyaconda River in Scotland County, Missouri. SSMB lies within the Cuivre-Salt EDU of the USACE District in Missouri. The Bank Site is a total of 35.2 (+/-) acres situated on a parcel of land adjacent to the South Wyaconda River that consists of degraded stream habitat and active agricultural and forested lands. The approximate center of the site is located at Latitude 40.46054°, Longitude -92.02574°.

The Sponsor seeks approval from the U.S. Army Corps of Engineers, St. Louis District (the District) and the Interagency Review Team (IRT); which is comprised of representatives from the USACE (Rock Island District), Missouri Department of Natural Resources, U.S. Environmental Protection Agency, Missouri Department of Conservation and U.S. Fish and Wildlife Service; to establish the SSMB, which is proposed in accordance with the approved UMBI. If approved, the Sponsor would make the stream mitigation credit available to Department of the Army permittees seeking to fulfill permit requirements to purchase compensatory mitigation credit to offset losses of aquatic functions and services. The SSMB proposes to generate 63,916.46 stream credits. The mitigation bank site includes the restoration, enhancement and preservation of stream habitat within the floodplain.