Regulatory Branch

MVS-2024-614, 615, 616

MVS
Published Jan. 27, 2025
Expiration date: 2/13/2025

The applicant, Southern Stone Company, LLC, requests permitting the prior facility’s upstream unpermitted fleeting area, adding a second barge loading dock, and installing a second fleeting area downstream of the proposed barge loading dock. The proposed project is located on right descending bank of the Mississippi River, between approximate river miles 70.9 to 71.7 in Cape Girardeau County, MO. The Public Notice comment period is open from 24 January 2025 through 13 February 2025. The Public Notice is available as an attachment here, and will be made available for viewing at: https://www.mvs.usace.army.mil/Missions/Regulatory/Public-Notices/ and the Regulatory Request System.