Solicitation Number |
Contract Number |
Title
|
Award Amount |
POC
|
Award Date
|
N/A |
W912P9-09-V-3082 |
RECOVERY--MEL PRICE AUX LOCK GATE SUPPLIES
TAS::96 3135::TAS
|
$9,681.89 |
Angie Grimes
(314) 331-8965 |
06/23/09 |
N/A |
W912P9-09-V-3085 |
RECOVERY--MEL PRICE RENTAL OF A 400 KW/480 3 PHASE GENERATOR
TAS::96 3135::TAS
|
$9,271.00 |
Angie Grimes
(314) 331-8965 |
06/23/09 |
W912P9-09-R-0731 |
W912P9-09-C-0413 |
RECOVERY--LOCK BULKHEAD LIFTING BEAM
Tracker # 78
TAS::96 3135::TAS
|
$486,866.00
|
Debbie Krems
(314) 331-8515
|
06/23/09 |
N/A |
W912P9-09-V-3083 |
RECOVERY--Testing for 2 Dry MT Ball Castings and of UT Boxes and Support Structures
Tracker # 86
TAS::96 3135::TAS
|
$2,500.00 |
Cheryl Cooper
(636) 899-0084 |
06/23/09 |
N/A |
W912P9-09-V-3084
W912P9-09-V-3084-mod |
RECOVERY--Testing for 2 Dry MT Ball Castings and of UT Boxes and Support Structures
Tracker # 86
TAS::96 3135::TAS
|
$2,500.00
$3,500.00 |
Cheryl Cooper
(636) 899-0084 |
06/23/09
08/14/09 |
N/A |
W912P9-09-P-1084 |
RECOVERY--SMALL CRAFT BARRIER CLARENCE CANNON DAM AND MARK TWAIN LAKE
TAS::96 3135::TAS
|
$191,026.00 |
Angie Grimes
(314) 331-8965 |
06/24/09 |
N/A |
W912P9-09-V-3087 |
RECOVERY--MEL PRICE AUX LOCK SPLIT I BEAM REPAIR
TAS::96 3135::TAS
|
$7,990.00 |
Angie Grimes
(314) 331-8965 |
06/25/09 |
N/A |
W912P9-09-F-5033 |
RECOVERY--Signs, 9x9, Lake Shelbyville, Shelbyville, IL
Tracker # 50B
TAS::96 3135::TAS
|
$222.00 |
Linda Werner
(217) 774-3867 |
06/25/09 |
N/A |
W912P9-09-V-3090 |
RECOVERY--NUTS AND BOLTS FOR MEL PRICE
TAS::96 3135::TAS
|
$9,276.12 |
Angie Grimes
(314) 331-8965 |
06/29/09 |
W912P9-09-T-7078 |
W912P9-09-C-0414 |
RECOVERY - Replacement of Four (4) Defective Bulkheads
US Army Engineer District, St. Louis, MO
Tracker # 77
TAS::96 3135::TAS
|
$1,429,440.00
|
Angie Grimes
(314) 331-8965 |
06/30/09 |
W912P9-09-T-7088 |
W912P9-09-P-1083 |
RECOVERY --SITE REPLACEMENT AT REND LAKE, BENTON, ILLINOIS
Tracker # 129
TAS::96 3135::TAS
|
$40,600.00 |
Tom Connell
(314) 331-8585
|
07/01/09 |
N/A |
W912P9-09-V-3091 |
RECOVERY--CAPS SCREWS AND HEX NUTS FOR MELVIN PRICE LOCK AND DAM MITER GATE REPAIR MOD
Tracker # 86
TAS::96 3135::TAS
|
$2,610.31 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3092 |
RECOVERY--Rental of Ice Machine for 2 month period for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$455.00 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3093 |
RECOVERY--Cylinder, Cylinder Band, Refill Oxygen Bank and accessories for the Melvin Price Lock and Dam Miter Gate Report Mod
Tracker # 86
TAS::96 3135::TAS
|
$1,837.36 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3094 |
RECOVERY--Steel Bars in different sizes for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$935.00 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3095 |
RECOVERY---Galvinized Cable, Eye & Eye Turnbuckle for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$1,033.50 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3096 |
RECOVERY--Weathershield in various sizes, Sheating, Bolt and Washers for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$2,517.02 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3097 |
RECOVERY--Flange Wedges in different sizes, Extension Cords for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$2,973.65 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3098
W912P9-09-V-3098-P00001 |
RECOVERY--Impact Wrench and different sizes of sockets for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$1,704.87
$13.83 |
Cheryl Cooper
(636) 899-0084 |
07/01/09
08/05/09 |
N/A |
W912P9-09-V-3100 |
RECOVERY--Torch, Hose and Cable Extension for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$708.00 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3101 |
RECOVERY--Various Drill Bits and Hex Bolts for Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$928.74 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3102 |
RECOVERY--Various Head and Carbide Burs for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$2,941.62 |
Cheryl Cooper
(636) 899-0084 |
07/01/09 |
N/A |
W912P9-09-V-3106 |
RECOVERY--Steel in various sizes for the Melvin Price Lock and Dam Miter Gate Repair
Tracker # 86
TAS::96 3135::TAS
|
$1,525.24 |
Cheryl Cooper
(636) 899-0084 |
07/02/09 |
N/A |
W912P9-09-V-3112
W912P9-09-V-3112-P00001 |
RECOVERY--Punches and Die in different sizes - P90 Tooling for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$379.60
$14.50 |
Cheryl Cooper
(636) 899-0084 |
07/02/09
07/22/09 |
W912P9-09-B-0212 |
W912P9-09-C-0412
W912P9-09-C-0412-P00001 |
RECOVERY - Downstream Bulkhead Recess Installation and Sill Beam Fabrication
Lock 25, Lincoln County, MO
Tracker # 79
TAS::96 3135::TAS
|
$1,997,700.00
price unchanged |
Debbie Krems
(314) 331-8515
|
07/14/09
09/29/09 |
W912P9-09-T-7092 |
W912P9-09-M-0079 |
RECOVERY--Grills, Ground for the Bo Wood Recreation Area located at Lake Shelbyville, Shelbyville, Illinois
Tracker # 50B
TAS::96 3135::TAS
|
$7989.75 |
Linda Werner
(217) 774-3867 |
07/15/09 |
N/A |
W912P9-09-V-3113 |
RECOVERY--Grit Sand for the Melvin Price Lock and Dam Miter Gate Repair Mod
Tracker # 86
TAS::96 3135::TAS
|
$2,591.00 |
Cheryl Cooper
(636) 899-0084 |
07/15/09 |
W912P9-09-T-7093 |
W912P9-09-M-0080 |
RECOVERY--Lantern Hangers for the Bo Wood Recreation Area located at Lake Shelbyville, Shelbyville, Illinois
Tracker # 50B
TAS::96 3135::TAS
|
$5337.54 |
Linda Werner
(217) 774-3867 |
07/16/09 |
N/A |
W912P9-09-V-3110
W912P9-09-V-3110-P00001
|
RECOVERY--SUPPLIES, LAMINATE TOP FOR MICRO-STUDY MODEL OF MN1000 OF ILLINOIS RIVER
Tracker # 35
TAS::96 3135::TAS
|
$408.60
-$98.60
$310.00 |
Debbie Warner
(314) 331-8527 |
07/16/09
07/19/09 |
W912P9-09-T-7101 |
W912P9-09-P-1098
W912P9-09-P-1098-P00001 |
RECOVERY - CONNECTOR BRIDGE FOR CALUMET CREEK NATURE TRAIL
Tracker # 93
TAS::96 3135::TAS
|
$39,500.00
$10,650.00 |
Angie Grimes
(314) 331-8965 |
07/16/09
08/20/09 |
W912P9-09-T-0741 |
W912P9-09-P-1099 |
RECOVERY--SUPPLY AND DELIVER THREE TRACTORS TO THE CARLYLE LAKE PROJECT OFFICE, CARLYLE, ILLINOIS
Tracker # 9
TAS::96 3135::TAS
|
|
Tom Connell
(314) 331-8585 |
07/17/09 |
N/A |
W912P9-09-P-1097 |
RECOVERY--TIMBERS AT SHOPS & YARDS AREA
Tracker # 75
TAS::96 3135::TAS
|
$86,960.00 |
Angie Grimes
(314) 331-8965 |
07/17/09 |
W912P9-09-T-0787 |
W912P9-09-M-0082 |
RECOVERY -- BACKHOE TRAILER & HD COMPACT TRACK LOADER TRAILER
Tracker # 129
TAS::96 3135::TAS
|
$15,779.00 |
Betty Foreman
(618) 724-7069
|
07/20/09 |
W912P9-09-R-0734 |
W912P9-09-C-0415 |
RECOVERY--Kaskaskia Dredging 2009, Re-Establish Channel from New Athens to Fayetteville, Kaskaskia River Miles 28 to 36
Tracker #
TAS::96 3135::TAS
|
$14,790,880.00 |
Millie B Washington
(314) 331-8511 |
07/22/09 |
W912P9-09-R-0735 |
W912P9-09-D-0535 |
RECOVERY--Public Relations Support of AMERICAN RECOVERY AND REINVESTMENT ACT of 2009
Tracker # 172 |
$250,428.00 |
Debbie Krems
(314) 331-8515 |
07/21/09 |
W912P9-09-B-0213 |
W912P9-09-C-0416 |
RECOVERY--Dike Notching & Recycle Stone, Dike Removal & Recycle Stone, Construction of Stone Fill Weir, Construction of Stone Fill Chevrons, Stone Fill Extension of Existing Dike
Tracker # 102
TAS::96 3134::TAS
|
$4,273,950.00 |
Judy Kibler
(314) 331-8521 |
07/24/09 |
N/A |
W912P9-09-F-5042 |
RECOVERY--Automated Fee Permit Machines for the Lake Shelbyville Project, Shelbyville, Illinois
Tracker # 49
TAS::96 3135::TAS
|
$114,635.31 |
Linda Werner
(217) 774-3867 |
07/28/09 |
W912P9-09-T-7098 |
W912P9-09-F-5043 |
RECOVERY--Picnic Tables for the Bo Wood Recreation Area at Lake Shelbyville, Shelbyville, Illinois
Tracker # 50B
TAS::96 3135::TAS
|
$30,480.42 |
Linda Werner
(217) 774-3867 |
07/29/09 |
W912P9-09-T-7099 |
W912P9-09-V-3121
W912P9-09-V-3121-P00001 |
RECOVERY--Furnish/install Fish Cleaning Station-Bo Wood Recreation Area, Lake Shelbyville, Shelbyville, IL
Tracker # 50A
TAS::96 3135::TAS
|
$14,858.00
$800.00 |
Linda Werner
(217) 774-3867 |
07/29/09
09/03/09 |
W912P9-09-T-7100 |
W912P9-09-V-3119
W912P9-09-V-3119-P00001
|
RECOVERY--Storage Container Rental, Lake Shelbyville, Shelbyville, IL
Tracker # 55
TAS::96 3135::TAS
|
$7,680.00
-$7,680.00
$0.00 |
Linda Werner
(217) 774-3867 |
07/29/09
08/03/09 |
W912P9-09-R-0747 |
W912P9-09-D-0536 |
RECOVERY--CURATION MATOC, MULTIPLE AWARDS, GSA CONTRACT SCHEDULE 899 SIN 899-1
TAS::96 3135::TAS
|
$10,800,000.00 |
Lisa White
(314) 331-8518
|
07/20/09 |
W912P9-09-D-0537 |
RECOVERY--CURATION MATOC, MULTIPLE AWARDS, GSA CONTRACT SCHEDULE 899 SIN 899-1
TAS::96 3135::TAS
|
$6,800,000.00 |
Lisa White
(314) 331-8518
|
07/17/09 |
W912P9-09-D-0538 |
RECOVERY--CURATION MATOC, MULTIPLE AWARDS, GSA CONTRACT SCHEDULE 899 SIN 899-1
TAS::96 3135::TAS
|
$6,800,000.00 |
Lisa White
(314) 331-8518
|
07/17/09 |
N/A |
W912P9-09-V-3120 |
RECOVERY - RE-HEATING OF PINTLE SOCKETS FOR THE WELDING REPAIRS FOR THE MELVIN PRICE LOCK AND DAM AUX GATE REPAIR MOD, EAST ALTON, IL
Tracker # 86
TAS::96 3135::TAS
|
$2,186.00 |
Cheryl Cooper
(636) 899-0084 |
08/03/09 |
N/A |
W912P9-09-V-3122 |
RECOVERY--Provide welding procedures for repairs to the pintle sockets for the Melvin Price Lock and Dam Aux Gate Repair Mod, East Alton, IL
Tracker # 86
TAS::96 3135::TAS
|
$2,450.00 |
Cheryl Cooper
(636) 899-0084 |
08/03/09 |
N/A |
W912P9-09-V-3126
W912P9-09-V-3126-P00001 |
RECOVERY--LOAD TESTING OF THE MELVIN PRICE LOCK AND DAM MITER GATE STRONGBACK
TAS::96 3135::TAS
|
$10,902.50
$12,897.50 |
Cheryl Cooper
(636) 899-0084 |
08/07/09
08/14/09 |
W912P9-09-R-0738 |
W912P9-09-C-0420 |
RECOVERY--ST. LOUIS FLOOD PROTECTION CLOSURE STRUCTURES GATE REPLACEMENTS AND PERMANENT CLOSURES
Tracker # 147
TAS::96 3135::TAS
|
$1,432,085.00 |
Barrietta Killiebrew
(314) 331-8514 |
08/10/09 |
N/A |
W912P9-09-F-5044 |
RECOVERY--PURCHASE OF HP DESIGNJET T1120PS 44-IN PRINTER FOR THE REND LAKE PROJECT OFFICE, BENTON, ILLINOIS Tracker # 141
TAS::96 3135::TAS
|
$6,556.70 |
Debbie Warner
(314) 331-8527 |
08/11/09 |
N/A |
W912P9-09-V-3133 |
RECOVERY--Shelving, Storage to be used to store item/boxes from buildings scheduled to be torn down at the Lake Shelbyville Project, Shelbyville, Illinois
Tracker # 55
TAS::96 3135::TAS
|
$2871.02 |
Linda Werner
(217) 774-3867 |
08/14/09 |
N/A |
W912P9-09-V-3128 |
RECOVERY--On-Site Boring on Upper Auxiliary Chamber Miter Gate Anchorage
Melvin Price Lock and Dam
TAS::96 3135::TAS
|
$6,700.00 |
Cheryl Cooper
(636) 899-0084 |
08/14/09 |
N/A |
W912P9-09-V-3130
|
RECOVERY--SHALLOW WATER OUTBOARD MOTOR
Rivers Project, West Alton, MO
TAS::96 3135::TAS
|
$5,34500 |
Cheryl Cooper
(636) 899-0084 |
08/14/09 |
W912P9-09-T-7109 |
W912P9-09-V-3139 |
RECOVERY-- NON-CLOG SUBMERSIBLE PUMPS
REND LAKE, BENTON, IL
Tracker # 129
TAS::96 3135::TAS
|
$130,250.00 |
Betty Foreman
(618) 724-7069
|
08/20/09 |
N/A |
W912P9-09-V-3141
W912P9-09-V-3141-P00001 |
RECOVERY--Facilitator for Visitor's Center Partnership Meeting, Mark Twain Lake, Monroe City, MO
TAS::96 3135::TAS
|
$1,675.00
$621.80 |
Jennifer Torrence
(573) 735-4097 |
08/20/09
09/03/09 |
N/A |
W912P9-09-V-3138
W912P9-09-V-3138-P00001 |
RECOVERY--STRAIN GAUGE LOAD CELL FOR ONSILL INDICATOR FOR MELVIN PRICE LOCK AND DAM
Tracker # 70
TAS::96 3134::TAS
|
$6,250.00
$97.34 |
Cheryl Cooper
(636) 899-0084 |
08/21/09
8/31/09 |
N/A |
W912P9-09-P-1112 |
RECOVERY--CRITICAL SIGNS FOR RIVERS PROJECT OFFICE
TAS::96 3135::TAS
|
$143,123.17 |
Angie Grimes
(314) 331-8965 |
08/24/09 |
W912P9-09-T-7102 |
W912P9-09-M-0089 |
RECOVERY--Furnish/install Spiral Staircase, Lake Shelbyville Dam and Reservoir, Shelbyville, IL
Tracker # 48
TAS::96 3135::TAS
|
$45,700.00 |
Linda Werner
(217) 774-3867 |
08/25/09 |
W912P9-09-T-7113 |
W912P9-09-P-1111
W912P9-09-P-1111-P00001 |
RECOVERY--REPLACE TREES IN RECREATIONAL AND WILDLIFE AREAS OF CARLYLE LAKE, CARLYLE, ILLINOIS
Tracker # 7
TAS::96 3135::TAS
|
$95,684.40
price unchanged |
Debbie Warner
(314) 331-8527 |
08/26/09
09/17/09 |
W912P9-09-R-0750 |
W912P9-09-P-1114
CANCELLED
W912P9-09-C-0426 |
RECOVERY--KASKASKIA LOCK REPLACEMENT STRUTS, USACE ST. LOUIS SERVICE BASE, ST. LOUIS, MISSOURI
Tracker # 41
TAS::96 3135::TAS
|
$74,700.00 |
Tom Connell
(314) 331-8585 |
09/04/09 |
W912P9-09-R-0753 |
W912P9-09-C-0421 |
RECOVERY--Supply Contract to manufacture, test and deliver seven (7) Culvert Valve Operating Machines and four (4) Culvert Bulkheads for Lock 27 - Deliver to the Service Base located at MRM 179, Foot of Arsenal Street, St. Louis, MO
Tracker # 103, 104
TAS::96 3135::TAS
|
$2,427,990.00 |
Judy Kibler
(314) 331-8521 |
08/28/09 |
W912P9-09-T-7110 |
W912P9-09-F-5047 |
RECOVERY--SMALL CRAFT BARRIERS REND LAKE, PROJECT NUMBER 323893 - TRACKER NUMBER 122
TAS::96 3135::TAS
|
$375,360.00 |
Treniece Stith
(314) 331-8520 |
08/27/09 |
W912P9-09-T-7111 |
W912P9-09-F-5049 |
RECOVERY--SMALL CRAFT BARRIERS CARLYLE LAKE, PROJECT NUMBER 323005 - TRACKER # 8
TAS::96 3135::TAS
|
$48,880.00 |
Treniece Stith
(314) 331-8520 |
08/27/09 |
N/A |
W912P9-09-V-3160 |
RECOVERY--Trafficguard Single Post, 30 inch post height, 4 inch clearance for Automated Fee Machines located at various recreation areas at the Lake Shelbyville Project, Shelbyville, IL
Tracker #
TAS::96 3135::TAS
|
$1,154.00 |
Linda Werner
(217) 774-3867 |
09/08/09 |
N/A |
W912P9-09-V-3162 |
RECOVERY--Electrical panels and breakers for the Automated Fee Machines that will be located at various recreation areas at the Lake Shelbyville Project, Shelbyville, Illinois.
Tracker # 49
TAS::96 3135::TAS
|
$439.72 |
Linda Werner
(217) 774-3867 |
09/08/09 |
W912P9-09-R-0749 |
W912P9-09-C-0422
Contract Specialist amended FedBizOpps 09/14/09 to add Awardee's DUNs Number... |
RECOVERY--BATCHTOWN FLOATING PUMP STATION, HABITAT REHIBILITATION AND ENHANCEMENT PROJECT LOCATED IN ILLINOIS
Tracker # 159
This is an 8(a) non-competitive solicitation
TAS::96 3134::TAS
|
$1,450,000.00 |
Diane Kubler
(314) 331-8528 |
09/09/09 |
W912P9-09-T-7133 |
W912P9-09-P-1118 |
RECOVERY--Picnic Shelter with Pit Toilet at Lincoln Shields Access Area, Upper Rivers Project
Tracker # 99
TAS::96 3135::TAS
|
$76,800.00 |
Angie Grimes
(314) 331-8965 |
09/10/09 |
W912P9-09-T-7134 |
W912P9-09-P-1119 |
RECOVERY--Handrails at Lincoln Shields Access Area, Upper Rivers Project
Tracker # 99
TAS::96 3135::TAS
|
$107,255.00 |
Angie Grimes
(314) 331-8965 |
09/10/09 |
W912P9-09-T-7138 |
W912P9-09-P-1127 |
RECOVERY---PRE-CAST WATER BORNE FAMILY STYLE SHOWER HOUSE, FOR WAPPAPELLO LAKE PROJECT, WAPPAPELLO, MO
Tracker # 160
TAS::96 3135::TAS
|
$230,942.93 |
Angie Grimes
(314) 331-8965 |
09/15/09 |
W912P9-09-T-7131 |
W912P9-09-V-3168 |
RECOVERY--CONTRACTOR TO PROVIDE ELECTRICAL SUPPLIES TO THE LAKE SHELBYVILLE PROJECT, SHELBYVILLE, ILLINOIS
Tracker # 50B
TAS::96 3135::TAS
|
$6,926.30 |
Linda Werner
(217) 774-3867 |
09/15/09 |
N/A |
W912P9-09-V-3164 |
RECOVERY--SIGNS TO READ: BUOY FLOATS, SLOW NO WAKE BUOY AND NO BOAT BUOY FOR RIVERS PROJECT OFFICE, WEST ALTON, MO
Tracker # 93
TAS::96 3135::TAS
|
$2,928.00 |
Cheryl Cooper
(636) 899-0084 |
09/15/09 |
W912P9-09-B-0218 |
W912P9-09-C-0428 |
RECOVERY--River Rock Removal, Mississippi River, Missouri and Illinois. Miles 46-38 and 81-78
Tracker # 105, 106
TAS::96 3134::TAS
|
$5,688,503.50 |
Judy Kibler
(314) 331-8521 |
09/16/09 |
N/A |
W912P9-09-V-3172 |
RECOVERY--GATE INVENTORY MARKERS, VINYL LETTERS, ENGINEER GRADE WHITE REFLECTIVE 4 INCHES TALL FOR RIVERS PROJECT OFFICE, WEST ALTON, MO
Tracker # 93
TAS::96 3135::TAS
|
$750.00 |
Cheryl Cooper
(636) 899-0084 |
09/18/09 |
N/A |
W912P9-09-V-3175 |
RECOVERY--HUMDIFIER FOR NATIONAL GREAT RIVERS MUSEUM, EAST ALTON, IL
Tracker # 89
TAS::96 3135::TAS
|
$8,738.00 |
Cheryl Cooper
(636) 899-0084 |
09/22/09 |
W912P9-09-T-7186 |
W912P9-09-P-1132 |
RECOVERY--Procurement of Compact Track Loader equal to or better than a 2009/2010 Case 420T Track Loader, 65 HP, for the Carlyle Lake Project Office, Carlyle, Illinois
Tracker # 9
TAS::96 3135::TAS
|
$35,795.00 |
Debbie Warner
(314) 331-8527 |
09/22/09 |
W912P9-09-R-0745 |
W912P9-09-C-0432 |
RECOVERY--Connection of Water Main From the Village of Ellis Grove, Ellis Grove, IL to the Well House at the Kaskaskia Lock and Dam, Modoc, IL
Project Number 323006
Tracker # 44
TAS::96 3135::TAS
|
$291,325.00 |
Kathleen Souders
(314) 331-8502 |
09/23/09 |
W912P9-09-R-0757 |
W912P9-09-C-0431 |
RECOVERY--MAIN DAM AND SADDLE DAM NO. 2, RIPRAP REPAIRS, CARLYLE LAKE, CARLYLE, ILLINOIS
Tracker #
TAS::96 3135::TAS
|
$12,646,784.50 |
Millie B Washington
(314) 331-8511 |
09/24/09 |
N/A |
W912P9-09-M-0117 |
RECOVERY--Remove carpet and install new carpeting at the National Great Rivers Museum, East Alton, MO
Tracker # 89
TAS::96 3135::TAS
|
$24,814.55 |
Cheryl Cooper
(636) 899-0084 |
09/25/09 |
N/A |
W912P9-09-M-0118 |
RECOVERY--Painting Interior/Exterior of the National Great Rivers Museum, East Alton, IL
Tracker # 89
TAS::96 3135::TAS
|
$7,850.00 |
Cheryl Cooper
(636) 899-0084 |
09/25/09 |