US Army Corps of EngineersClck here to return to the homepage
St. Louis District - Project Management Division
Building Strong
Wood River Levee

AUTHORIZATION:  Section 4 of the Flood Control Act of 1938; Section 1001(20) of WRDA 2007.

Project Map - Wood River
Project Map

 



Location and Description:  The project area is located in the Mississippi River flood plain of Madison County, Illinois, upstream of the city of East St. Louis.  An urban design levee, authorized in 1938 and constructed in the 1950s, protects the area.  The proposed project includes replacing 163 of 170 existing relief wells and installing 60 new relief wells as a deficiency correction under the existing project authorization.  Additional reconstruction/replacement is proposed for various components of 26 closure structures, 38 gravity drains, and 7 pump stations.  The reconstruction portion was authorized by WRDA 2007.  These recommended actions are required to maintain the system’s authorized level of protection. 

Activities in FY 2010 ($1,105k)
- Design work (design deficiency correction and reconstruction)
- Continue construction (relief wells, gravity drains)

ARRA Allocation thru 28 Feb 10 ($12,179)
- Complete phase 1 gravity drain repairs (awarded)
- Complete phase 1 construction and rehab of pump stations
- Construct additional relief wells (awarded)
- Complete phase 1 construction on closure structures
- Complete phase 2 gravity drain repairs Construct relief wells and/or berms
President’s Budget for FY 2011 ($1,098k)
- Closure structure design work
- Pump station construction
- Develop decision document for additional needed measures
 

Local Sponsors:  Wood River Drainage and Levee District

 

 
Deteriorated Floodgate
Deteriorated Closure Structure Abutment
Drilling relief well pilot holes
Pilot Hole Drilling for Relief Well Design
Hartford Refinery
Hartford Refinery
   
 
Last updated: Saturday, March 27, 2010 2:50 PM