.....Wappapello Lake Master Plan

Frames

SECTION I
Introduction

SECTION II
Project Description

SECTION III
Operating Projects: Status

SECTION IV
Recreational and Environmental Resources

SECTION V
Factors Influencing and Constraining Resource Development and Management

SECTION VI
Coordination and Partnering with Other Agencies

SECTION VII
Resource Use Objectives

SECTION VIII
Resource Plan

SECTION IX
Facility Load and Other Design Criteria

SECTION X
Special Problems

SECTION XI
Special Programs

SECTION XII
Operational Management Plan

SECTION XIII
Field Analysis of Cost

SECTION XIV
Conclusions and Recommendations

SECTION XV
Plates

SECTION XIV
Appendixes

SECTION XIII - FIELD ANALYSIS OF COST

13.01 INTRODUCTION

  1. General. The following table shows preliminary field analysis of cost for development of proposed new actions at Wappapello Lake. The quantities and costs represent a typical Corps guide specification level of design and materials. During actual detailed design of each element, variations in types and quantities of materials, modifications of facilities, inflationary trends, and results from additional engineering tests, will undoubtedly occur. Costs are based on current prices received for similar items of work in the St. Louis District. Price level is 1999.


  2. Summary of Costs. Field estimates for the proposed new actions.